Telegram Group 🔥🔥🔥
Get answers in minutes
Questions answered :
48
/50
Answer verified
It is proposed to widen and strengthen an existing 2-lane NH section as a divided highway. The existing traffic in one direction is 2500 commercial vehicles (CV) per day. The construction will take 1 year. The design CBR of soil subgrade is found to be 5 percent, Given: traffic growth rate for CV = 8 percent, vehicle damage factor = 3.5 (standard axles per CV), design life = 10 years and traffic distribution factor = 0.75. The cumulative standard axles (msa) computed are
🗓 Dec 7, 2021
votes
Megan
🌐 India
give solution please
votes
Kimberly
🌐 India
Thank you so much for the answer
Was your question answered?
Thanks for the feedback! ✅
Want to get famous? 📸
Answer question and get 🤩 high-lighted on our homepage.