Total load =4000*4=16000KN
Pressure= 16000/100= 160KN/m2
But the max bearing capacity of soil is 100KN /m2
So, we can provide Raft and combined footing.
So we have to provide Pile Foundation.
Option C is correct one
Pressure= 16000/100= 160KN/m2
But the max bearing capacity of soil is 100KN /m2
So, we can provide Raft and combined footing.
So we have to provide Pile Foundation.
Option C is correct one